No products
ATIS 0600010.03 2011 Edition, July 2011 Heat Dissipation Requirements...
UIC 800-50:1973-07 Allowable variations on dimensions when no tolerances are indicated for parts shaped by removal of metal Loading...
UIC D 90 RP 7:1973-04 PROBLEMS OF HIGH STRENGTH BOLTED CONNECTIONS IN STEEL CONSTRUCTION - The effect of weathering on assembled high strength bolted connections under various conditions Loading...
UIC D 87 RP 6:1973-04 UNCONVENTIONAL TRACKS - Noise and vibration from unconventional tracks (Experiments at Radcliffeon Trent 1969 and 1970) Loading...
UIC D 87 RP 8:1973-04 UNCONVENTIONAL TRACKS - Laboratory and site measurements of stiffness and damping of selective types of direct fixing for tracks without ballast Loading...
UIC D 128 RP 1:1973-04 STATISTICAL DISTRIBUTION OF AXLE LOADS AND STRESSES IN RAILWAY BRIDGES - Introduction and definitions Loading...
UIC D 123 RP 2:1973-04 INVESTIGATION OF BRIDGE DECKS WITH CONCRETE ENCASED GIRDERS - Static tests on experimental decks Nos. 2 and 3 Loading...
UIC D 120 RP 2:1973-04 DEVELOPMENT OF HEAVY RAIL-PROFILES - Study of a new 60 kg/m rail Loading...
UIC D 117 RP 2:1973-04 OPTIMUM ADAPTATION OF THE CONVENTIONAL TRACK TO FUTURE TRAFFIC - Study of the change in the track level as a function of the traffic and of the track components. (First results of laboratory and site tests) Loading...
UIC D 117 RP 3:1973-04 OPTIMUM ADAPTATION OF THE CONVENTIONAL TRACK TO FUTURE TRAFFIC - The behaviour of rails in relation to their conditions of use Loading...
UIC D 101 RP 5:1973-04 BRAKING AND ACCELERATION FORCES ON BRIDGES AND INTERACTION BETWEEN TRACK/nAND STRUCTURES - Braking and starting tests on a steel bridge of 30 m span with ballast bed Loading...
UIC B 107 RP 3:1973-04 UNIFICATION OF AIR-CONDITIONING AND HEATING INSTALLATIONS - Unconventional air conditioning systems for railway service Loading...
UIC S 1004 RP 2:1973-04 MAXIMUM SPEED ATTAINABLE ON WHEEL/RAIL SYSTEMS - Preliminary investigation (Supplement) Loading...